Selected work

A shortlist rather than an archive. Most client work sits under NDA for six to twelve months, so what is here tends to lag behind what we are actually flying.

Marina reclamation, 2025–2026. Eighteen months of monthly progress capture for a civil contractor. Fixed flight lines, same time of day, same altitude, so the frames stack cleanly into a timelapse. Delivered as both a cut sequence and a set of georeferenced orthomosaics.

Southern islands, 2025. Three days of first-light passes for a tourism board campaign. Tight window — the light we wanted lasted about forty minutes a morning.

Heritage shophouse survey, 2024. Facade documentation for a conservation study. Close-quarters flying between buildings, which meant a smaller airframe and a lot of pre-planning with the site team.

Second unit, feature production, 2024. Two weeks of aerial plates. We are not a full film services outfit, but we can slot into one.